Quick answer
Fire detection and alarm is a MasterFormat Division 28 lookup. Some project manuals label the work 28 31 00, and other references use 28 46 00. Check the project manual and verify the number and title in its MasterFormat edition before using either reference in a bid package, submittal, or estimate.

Why you may see two different numbers
The Wisconsin Division of Facilities Development publishes an owner specification for Fire Detection and Alarm under 28 31 00. The National Research Council Canada’s National Master Specification records a renumbering of Fire Detection and Alarm from 28 31 00 to 28 46 00. It also lists Intrusion Detection under 28 31 00 in that updated publication. These examples show why the number alone is an unreliable way to identify the work across different project manuals.
When a drawing, estimate, or submittal uses a familiar fire alarm number, compare the number and title with the governing manual. A project can retain an older owner specification or use its own project identifiers. Keep that project reference on the record and document any separate classification used for comparison or reporting.
Check the project’s fire alarm scope
Start in Division 28 and look for the actual title in the project manual. Review the accompanying drawings, applicable addenda, and technical requirements. If the project specifies multiple sections for different parts of the system, keep those section references separate so the estimating and delivery teams can trace their scope.
For example, an estimator pricing a renovation may see 28 31 00 on an old estimate and 28 46 00 in the current project manual. Compare the descriptions, confirm the revision, and record the reference applicable to the bid. If a controls interface or testing responsibility remains unclear, record it for project clarification before treating the line item as complete.
Coordinate the interfaces
Fire suppression scope, electrical power, and communications infrastructure can appear elsewhere in the manual. Review the related sections and drawings for the connections specified on the job. Identify which party is assigned the equipment, connections, and testing at each interface. The Division 27 vs Division 28 comparison shows how to separate a communications network from the system it supports.
Keep those decisions visible in the estimate or submittal record. A classification is a way to locate and organize the work. Design requirements, applicable codes, and acceptance criteria come from the governing documents and project review.
Keep the original reference when reviewing older records
If you are reconciling a historical estimate or asset register, preserve the original number, title, and source. Add the verified reference in a separate field with the date and edition of the check. That gives a reviewer the information needed to reproduce the decision and prevents a bulk renumbering from erasing project history.
Verify the number and title in CDS
Open [standards search](https://standards.theconstructionstandard.com/web/search), choose the MasterFormat edition required for the project, and search by the title or the number. Review the result in its division hierarchy and compare it with the actual project section. If the title or number differs, record both references and resolve the difference before changing active project documents. Use MasterFormat online for related lookup options, sign up for access, or review company pricing.
Access Current CSI Standards
CSI Dynamic Standards provides authorized access to MasterFormat, UniFormat, and OmniClass through a connected, edition-aware platform. Create an account to view access options, or review pricing for organization-wide standards use.
Sources and review scope
Reviewed against CSI’s public standards information for scope, terminology, and licensing context. This public guide provides orientation and does not reproduce or replace the licensed standard. Content review date: November 10, 2026.
People also search for
Explore closely related CSI divisions, standards, and construction classification topics.
Access MasterFormat®, UniFormat®,
and OmniClass®