01 10 00 Summary

See where Section 01 10 00 Summary fits in Division 01 and how to use it to check project scope, phasing, and owner occupancy.

Quick answer

Project manuals use 01 10 00 for Summary in Division 01, General Requirements. It is a starting point for understanding the work as a whole, including how it is divided or phased and what restrictions affect the site. Read the project’s summary together with the drawings and technical sections before assigning detailed scope.

CSI Dynamic Standards search workspace with MasterFormat 2026 Edition and 26.1 OIR selected
Search by number, title, or keyword in CDS. This example shows MasterFormat 2026 and OIR 26.1 selected.

Example: renovating an occupied school

An estimator pricing a phased school renovation opens the Summary to see which rooms are available at each stage and whether the school will stay open. The demolition and finishes sections describe their respective work. The project-wide phasing can affect crew moves, protection, and when work can take place, even if the quantities in the technical sections stay the same.

Record the affected rooms and sequence on the estimate and cite the drawings or section that establishes each restriction. Where the Summary refers to separate work by the owner, identify the handoff on the schedule and check who provides access and protection. If an addendum changes the sequence, update the affected assumptions across trades.

Where to look next in the project manual

  • Overall work and occupancy. Read the Summary and any phasing drawings for the project-wide description, owner occupancy, and work by others.
  • Working hours and access. Follow the manual’s references to work restrictions or temporary controls where those requirements are provided separately.
  • Technical scope. Read each affected specification section and the drawings to determine what the trade must furnish, install, or remove.

What to carry into the scope review

Keep the summary reference alongside the drawing and technical-section references. For example, a room listed in the phase schedule may be available for flooring only after owner equipment has been removed. The scope record should identify the party responsible for removal and the milestone that releases the room. When that assignment is unclear, flag it for clarification before treating the schedule or price as final. Use the same references in the preconstruction meeting so the team can check the assumptions against the current issue of the project documents.

Verify the section in CSI Dynamic Standards

In CSI Dynamic Standards search, enter 01 10 00. Compare the number and title with the MasterFormat edition used for the project. If the project manual uses a different title, search by the work description as well, and compare the nearby results before selecting a reference.

An edition change and a project addendum answer different questions. The edition identifies how the work is classified. The addendum can revise what a team must price or deliver. If you are reusing an office master or an estimate from another job, compare both the classification and the current scope before carrying over the reference. Record which documents you checked and when, especially if another team will use the same reference later for procurement or field review.

Keep the section number and title printed in the project manual when recording a bid item, submittal, or field question. If you also track a classification for a different edition, record that separately so your team can trace the decision back to the original project documents. Browse the parent MasterFormat division for related work, or see CSI section number lookup for help finding other references. Sign up for access to use the platform.

Access Current CSI Standards

CSI Dynamic Standards provides authorized access to MasterFormat, UniFormat, and OmniClass through a connected, edition-aware platform. Create an account to view access options, or review pricing for organization-wide standards use.

Sources and review scope

Reviewed against CSI’s public standards information for scope, terminology, and licensing context. This public guide provides orientation and does not reproduce or replace the licensed standard. Content review date: November 10, 2026.

COMMON QUESTIONS
Use it for project-wide context. Read the applicable technical sections, drawings, contract documents, and addenda for the detailed scope and assignments.